Monroe Gas Storage Company, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/29/2009, Docket: RP09-447-000, Status: Effective

Original Sheet No. 138 Original Sheet No. 138

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

7. PRIORITY, INTERRUPTION OF SERVICE AND OPERATIONAL FLOW ORDERS

 

7.1 Priority of Service. Any Customer executing a Service Agreement with

Operator shall be entitled to the storage, parking, loaning, wheeling,

imbalance trading or balancing of gas in the following order of

declining priority:

 

(a) Firm storage service under Rate Schedule FSS at primary Point(s)

of Receipt, not in excess of MDRQ, or at primary Point(s) of

Delivery, not in excess of MDDQ, located on Operator's Facility.

 

(b) Firm storage service under Rate Schedule FSS at secondary Point(s)

of Receipt or Delivery located on Operator's Facility, not to

exceed Customer's MDIQ/MHIQ or MDWQ/MHWQ; Firm storage service

under Rate Schedule FSS at primary Point(s) of Receipt located in

Operator's Facility in excess of MDRQ but less than or equal to

MDIQ, and Firm storage service under Rate Schedule FSS at primary

Point(s) of Delivery located on Operator's Facility, in excess of

MDDQ but less than or equal to MDWQ.

 

(c) Make-up volumes to correct prior variances between (i) Transporter

and Operator under a balancing agreement, (ii) Customer and

Operator, and (iii) Customer and Transporter if the variance was

due to Operator's failure to receive or deliver Customer's

scheduled volumes.

 

(d) Enhanced hub storage service under Rate Schedules EPS and ELS

pursuant to Section 7.2(a) below.

 

(e) Interruptible storage service for Authorized Overrun Service for

excess storage gas, excess injection gas or excess withdrawal gas

under Rate Schedule FSS, for interruptible storage service under

Rate Schedule ISS and for interruptible hub service under Rate

Schedules IPS, ILS, IWS, IBTS, and IBS pursuant to Section 7.2(b)

below.

 

(f) Extended injections in excess of MDRQ/24 or extended withdrawals

in excess of MDDQ/24 for firm service under Rate Schedule FSS.

 

If a capacity constraint is anticipated or planned (e.g. for system

maintenance), Operator shall post notice of the anticipated constraint

on its Web Site in advance of the start of the constraint period.