West Texas Gas, Inc.
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1996, Docket: RP96-377-000, Status: Effective
Original Sheet No. 32Q Original Sheet No. 32Q : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
19.6 Assessment of past performance.
(a) General rule.
(1) Prior Commission approval is required before
Seller may recover through a surcharge (surcharge recovery)
its actual purchased gas costs (determined in Paragraph 19.6
(d) below) that exceed its computed projected purchased
gas costs (determined in Paragraph 19.6(e) below) for each
test interval (described in Paragraph 19.6(b) below) by
three percent.
(2) Seller determines the amount of gas costs which
requires specific Commission approval for surcharge recovery
under Paragraph 19.6(c) below.
(3) If the Commission denies Seller recovery of any
under-recovered purchased gas costs as a result of this
section, then the amounts denied recovery shall be credited
to Account No. 191 and charged to Account No. 426.5, "Other
Deductions" of the Uniform System of Accounts in 18 C.F.R
Part 201.
(b) Test intervals. Seller shall divide the deferral
period into four test intervals. The first test interval is the
first four months of the deferral period. The second test
interval is the three months following the first interval. The
third interval is the three months following the second interval.
The fourth interval is the remaining two months of the deferral
period.