Norteño Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1996, Docket: CP96- 81-007, Status: Effective
Original Sheet No. 226 Original Sheet No. 226 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
1.8 Delivery Point - The term "Delivery Point" shall
mean the point on Norte¤o's system where it
delivers gas to a Buyer or for the account of a
Shipper.
1.9 Division - The term "Division" shall mean either
Norte¤o's, Southern Division or Del Norte Division,
as defined in this Tariff.
1.10 Force Majeure - The term "Force Majeure" shall
mean any of the events or conditions described in
Section 14 of the General Terms and Conditions.
1.11 Heat Content - The term "Heat Content" shall mean
the number of BTUs produced by the combustion in a
calorimeter at constant pressure, of the amount of
gas which would occupy one cubic foot at an
absolute pressure of 14.73 pounds per square inch
and 60 degrees Fahrenheit, on a dry basis, with
air of the same temperature and pressure as the
gas, when the products of combustion are cooled to
the initial temperature of the gas and air and
when the water formed by combustion is condensed
to the liquid state.
1.12 MCF - The term "MCF" shall mean 1000 cubic feet at
a pressure of 14.73 psia and a temperature of 60
degrees Fahrenheit (degrees F).
1.13 MDCQ - The Term "MDCQ" shall mean the maximum
daily contract quantity that Buyer is entitled to
purchase under any of Norte¤o's Sales Rate
Schedules.
1.14 MDTQ - The term "MDTQ" shall mean the maximum
daily transportation quantity that Shipper is
entitled to receive under any of Norte¤o's
Transportation Rate Schedules.
1.15 MDQ - The term "MDQ" shall mean the maximum daily
quantity, measured in MMBTU's, at any Receipt
Point or Delivery Point that Norte¤o is obligated
to receive or deliver, and that Shipper and/or
Buyer may request for delivery to Norte¤o or
receipt from Norte¤o.