Norteño Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/1996, Docket: CP96- 81-007, Status: Effective

Original Sheet No. 159 Original Sheet No. 159 : Superseded

 

 

RATE SCHEDULE RCS

FIRM TRANSPORTATION SERVICE - RELEASED CAPACITY

(continued)

 

6. POSTING OF RELEASED CAPACITY:

 

Any Capacity Release Notice received by Norte¤o

pursuant to Sections 4 or 5 of this Rate Schedule shall

be posted by Norte¤o on its Electronic Bulletin Board

in accordance with the following criteria:

 

(a) A pre-arranged release at Norte¤o's maximum tariff

rates applicable to the Transportation Rate

Schedule FT-S or FT-DN under which the capacity is

being released shall not be posted for bidding;

however it shall be posted for information

purposes within 48 hours after the effective date

of the release.

 

(b) A pre-arranged release for a period of less than

31 days shall not be posted for bidding; however

it shall be posted for information purposes within

48 hours after the effective date of the release.

 

(c) For capacity to be released for a term not

exceeding six (6) months, the notice shall be

posted at least forty eight (48) hours prior to

the effective date of the release for a period of

twenty-four (24) hours.

 

(d) For capacity to be released for a term longer than

six (6) months, the notice shall be posted at

least twenty-eight (28) days prior to the

effective date of the release for a period of

fourteen (14) days.

 

(e) With respect to any notice of a pre-arranged

release which has been posted for bidding, if the

posting results in a better offer then the pre-

arranged bidder shall have two (2) business days

after notification of such better offer in which

to match such better offer. A pre-arranged bidder

matching the better offer shall be awarded the

Released Capacity.