Norteño Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1996, Docket: CP96- 81-007, Status: Effective
Original Sheet No. 119 Original Sheet No. 119 : Superseded
RATE SCHEDULE FT-S
FIRM TRANSPORTATION SERVICE - SOUTHERN DIVISION
(Continued)
of materials, and construction shall be
subject to approval by Norteno's
inspectors.
(2) Shipper shall coordinate the
construction of such facilities with
Norte¤o so that Norte¤o may reasonably
have inspectors at the site during
construction. Shippers assume full
responsibility and liability and agree
to hold Norte¤o harmless from any
liability of any nature arising from the
installation of such facilities by
Shipper, or Shipper's agents. It is the
Shipper's responsibility to assure that
all facilities installed and owned by
Shipper or any other party upstream of a
receipt point or downstream of a
delivery point comply with all
applicable governmental regulations and
design requirements for their intended
use (i.e., pressure, control, etc.).
5.5 Norte¤o may from time to time and at any time at
its sole discretion charge any individual Shipper
for transportation service under Rate Schedule
FT-S a rate which is lower than the charge that
would apply based on the maximum rates set forth
on Sheet No. 10 or provided for in Section 5
herein; provided, however that such total charge
may not be less than the charge based on the
Minimum Rate set forth on Sheet No. 10 for Rate
Schedule FT-S. If Norte¤o charges any Shipper a
rate which is less than the Maximum Rate, Norte¤o
shall file with the Commission any and all reports
as required by the Commission's Regulations
setting forth the applicable charge, the
individual Shippers affected, the volume
transported and any other information which may be
required.