Enbridge Offshore Pipelines (Utos) LLC
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-445-000, Status: Effective
Original Sheet No. 117C Original Sheet No. 117C : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
6. RECEIPT AND DELIVERY
6.1 Points of Receipt. The Points of Receipt hereunder shall
be the points of connection between the facilities of UTOS
and the facilities of Shippers or others at the points on
the System where Shippers deliver, or cause to be
delivered, Gas to UTOS for transportation service. UTOS
will make all Points of Receipt available to all Shippers,
either as Primary Points of Receipt or as Secondary Points
of Receipt, as defined in subsections 6.2 and 6.3 of this
Section 6.
6.2 Primary Points of Receipt. Primary Points of Receipt are
those points set forth on Exhibit A of the Transportation
Agreement for which an MDV is stated.
6.3 Secondary Points of Receipt. Secondary Points of Receipt
are all Points of Receipt on UTOS' System other than
Primary Points of Receipt, as defined in subsection 6.2 of
this Section 6.