1. DEFINITIONS
1.1 The term "Associated Liquids" shall mean condensate (without
free water) produced in conjunction with the production of
Gas to be transported in the System and liquefiable
hydrocarbons contained in such Gas but not including oil.
1.2 The term "Authorized Overrun" shall mean nominations of
a Shipper, in excess of contract MDV's, that UTOS is
obligated to schedule and transport, to the extent of
available capacity, under Section 7.8 of the General
Terms and Conditions.
1.3 The term "Btu" shall mean one (1) British thermal unit, the
amount of heat required to raise the temperature of one (1)
pound of water one (1) degree Fahrenheit at sixty (60)
degrees Fahrenheit. (Btu is measured on a dry basis at
14.73 psia.)
1.4 The term "Business Day" shall mean Monday through Friday,
excluding Federal Banking holidays.
1.5 The term "Central Time" shall mean Central Clock Time, which
includes the recognition of Daylight Savings Time.
1.6 The term "Currently Effective Contract Demand" shall
mean the aggregate of the maximum daily volumes of Gas,
expressed in Dth per Day, which UTOS is obligated to
accept for transportation for the account of each firm
shipper under UTOS' F.E.R.C. Gas Tariff, Original Volume
No. 2, and Fifth Revised Volume No. 1.
1.7 The term "Daily Allocation" shall mean the process where
the Allocation Party performs the allocation process
following each Gas Day.
1.8 The term "Day" or "Gas Day" shall mean a period of 24
consecutive hours, ending at 9:00 a.m. Central Time.
1.9 The term "Designated Allocator" shall mean the production
operator at the individual UTOS measurement point, or an
alternate party designated by the production operator who
will be responsible for providing UTOS with the required
predetermined allocations at such UTOS measurement point.
1.10 The term "Dth" or "Dekatherm" shall mean 1,000,000 Btu.
1.11 The term "Elapsed Prorata Capacity" shall mean that portion
of the capacity that would have theoretically been available
for use prior to the effective time of the intraday recall
based upon a cumulative uniform hourly use of the capacity.