Enbridge Offshore Pipelines (Utos) LLC

FIFTH REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2009, Docket: RP09-815-000, Status: Effective

Second Revised Sheet No. 101 Second Revised Sheet No. 101

Superseding: First Revised Sheet No. 101

 

GENERAL TERMS AND CONDITIONS

 

1. DEFINITIONS

 

1.1 The term "Associated Liquids" shall mean condensate (without

free water) produced in conjunction with the production of

Gas to be transported in the System and liquefiable

hydrocarbons contained in such Gas but not including oil.

 

1.2 The term "Authorized Overrun" shall mean nominations of

a Shipper, in excess of contract MDV's, that UTOS is

obligated to schedule and transport, to the extent of

available capacity, under Section 7.8 of the General

Terms and Conditions.

 

1.3 The term "Btu" shall mean one (1) British thermal unit, the

amount of heat required to raise the temperature of one (1)

pound of water one (1) degree Fahrenheit at sixty (60)

degrees Fahrenheit. (Btu is measured on a dry basis at

14.73 psia.)

 

1.4 The term "Business Day" shall mean Monday through Friday,

excluding Federal Banking holidays.

 

1.5 The term "Central Time" shall mean Central Clock Time, which

includes the recognition of Daylight Savings Time.

 

1.6 The term "Currently Effective Contract Demand" shall

mean the aggregate of the maximum daily volumes of Gas,

expressed in Dth per Day, which UTOS is obligated to

accept for transportation for the account of each firm

shipper under UTOS' F.E.R.C. Gas Tariff, Original Volume

No. 2, and Fifth Revised Volume No. 1.

 

1.7 The term "Daily Allocation" shall mean the process where

the Allocation Party performs the allocation process

following each Gas Day.

 

1.8 The term "Day" or "Gas Day" shall mean a period of 24

consecutive hours, ending at 9:00 a.m. Central Time.

 

1.9 The term "Designated Allocator" shall mean the production

operator at the individual UTOS measurement point, or an

alternate party designated by the production operator who

will be responsible for providing UTOS with the required

predetermined allocations at such UTOS measurement point.

 

1.10 The term "Dth" or "Dekatherm" shall mean 1,000,000 Btu.

 

1.11 The term "Elapsed Prorata Capacity" shall mean that portion

of the capacity that would have theoretically been available

for use prior to the effective time of the intraday recall

based upon a cumulative uniform hourly use of the capacity.