Total Peaking Services, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1998, Docket: CP96-339-001, Status: Effective
Original Sheet No. 59 Original Sheet No. 59 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
5. OPERATING CONDITIONS (Continued)
5.3 Operating Conditions for the Receipt of LNG from, and the
Delivery of LNG to, Customer's Truck(s) (Continued)
(c) The loading and unloading of LNG shall be carried
out in accordance with applicable safety and other
regulations.
(d) LNG shall be loaded or unloaded, as the case may be,
only into trailers certified by the Department of
Transportation to transport LNG and operated by
approved hazardous material operators.
(e) Customer shall give written notice to Total Peaking
of the date and hour of arrival at Total Peaking's
Facilities of Customer's Truck(s) not less than
twenty-four (24) hours in advance of the estimated
time of arrival.
(f) If the Customer's Truck does not arrive at Total
Peaking's Facilities as scheduled, Total Peaking
shall unload or load, as the case may be, Customer's
Truck at the first available time when such
unloading or loading can be accomplished without
detriment to any other scheduled service.
(g) It shall be Customer's responsibility to assure that
each Customer's Truck, Customer's driver and load of
LNG is in compliance with all applicable codes and
regulations pertaining to the design, construction,
and operation of containers for the transportation
of LNG, including such limitations as Total Peaking
may require in connection with its facilities.
(h) It shall be Customer's responsibility to have proper
insurance for Customer's Truck(s), and Customer
shall provide Total Peaking with a certificate of
insurance satisfactory to Total Peaking prior to the
movement of Customer's Truck onto Total Peaking's
property. This requirement is without limitation to
other insurance requirements specified in this
tariff or required by law.