Cimarron River Pipeline, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2008, Docket: CP08-17-003, Status: Pending

Substitute Original Sheet No. 182 Substitute Original Sheet No. 182

 

GENERAL TERMS AND CONDITIONS

 

6.2 Delivery Points: Transporter will deliver gas at each Delivery Point

against the pressures maintained in the downstream pipeline from time to

time, but not in excess of Transporter's maximum allowable operating

pressure at the Delivery Point. Notwithstanding, Transporter shall not be

obligated to install additional compression to make deliveries. Transporter

shall make reasonable efforts to operate its system so that the pressure

meets or exceeds the minimum Delivery Point pressures at the following

Delivery Points:

 

Minimum

Point Pressure,

MID ID. Delivery Point psig State County

1 78977 PVR Spearman Plant 490 TX Ochiltree

2 59370 PVR Beaver Plant/NNG

Beaver Plant Del. 680 OK Beaver

2 78612 NNG/DCP Elmwood 720 OK Beaver

3 78613 NNG/DCP Tangier 250 OK Woodward

4 78888 NNG/PEPL Line No. 100 625 KS Kiowa

4 Mullinville Interconnect

with NNG 625 KS Kiowa

 

Only those Delivery Points listed in the table above have a minimum Delivery

Point pressure.

 

6.3 Should any event of force majeure (including any unplanned outage) or

any planned outage on or affecting Transporter's system affect Transporter's

ability to maintain pressure above or below a stated level or range at any

point on Transporter's system, Transporter's obligation to maintain such

pressure shall be suspended until the event of force majeure or planned

maintenance has been resolved or completed.