Cimarron River Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2008, Docket: CP08-17-001, Status: Effective
Original Sheet No. 182 Original Sheet No. 182
GENERAL TERMS AND CONDITIONS
6.2 Delivery Points: Transporter will deliver gas at each Delivery Point
against the pressures maintained in the downstream pipeline from time to
time, but not in excess of Transporter's maximum allowable operating
pressure at the Delivery Point. Notwithstanding, Transporter shall not be
obligated to install additional compression to make deliveries. Transporter
shall make reasonable efforts to operate its system so that the pressure
meets or exceeds the minimum Delivery Point pressures at the following
Delivery Points:
Maximum
Point Pressure,
MID ID. Delivery Point psig State County
1 78977 PVR Spearman Plant 490 TX Ochiltree
2 59370 PVR Beaver Plant/NNG
Beaver Plant Del. 680 OK Beaver
2 78612 NNG/DCP Elmwood 720 OK Beaver
3 78613 NNG/DCP Tangier 250 OK Woodward
4 78888 NNG/PEPL Line No. 100 625 KS Kiowa
4 Mullinville Interconnect
with NNG 625 KS Kiowa
Only those Delivery Points listed in the table above have a minimum Delivery
Point pressure.
6.3 Should any event of force majeure (including any unplanned outage) or
any planned outage on or affecting Transporter's system affect Transporter's
ability to maintain pressure above or below a stated level or range at any
point on Transporter's system, Transporter's obligation to maintain such
pressure shall be suspended until the event of force majeure or planned
maintenance has been resolved or completed.