Kinder Morgan Louisiana Pipeline LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2009, Docket: RP09-257-000, Status: Effective

Original Sheet No. 229 Original Sheet No. 229

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

19.3 SUSPENSION OF RECEIPTS

 

Should any Gas delivered by or on behalf of Shipper to

KMLP at any Receipt Point fail at any time to conform to any of the

specifications provided for in this Section 19, KMLP may, at its

option, suspend all or a portion of the receipt of any such Gas.

KMLP shall be relieved of any of its obligations for the duration

of such suspension. Upon receipt of KMLP's notice of such a

failure, Shipper shall make a diligent effort to correct the

failure by treatment or dehydration consistent with prudent

operation so as to tender Gas conforming to the specifications

provided for in this Section 19.

 

19.4 NONCOMPLIANCE WITH SPECIFICATIONS

 

Non-conforming Gas will likely enter KMLP's system from

time-to-time. Once KMLP becomes aware based on periodic quality

measurements that non-conforming Gas is entering its system, it

will promptly advise the Shipper(s) and point operators involved

that the Gas they are tendering is non-conforming, identifying the

nature and extent of the non-conformity, and that the Gas quality

standards herein must be met. Where operationally feasible, KMLP

will continue to accept non-conforming Gas for a limited period of

time while the Shipper(s) or point operators involved take steps to

adjust operations so as to address the Gas quality issues.

 

(a) Should Shipper tender for receipt any Gas that

causes the composite Gas stream in KMLP's facilities to fail the

requirements of any downstream pipeline, KMLP may take whatever

action necessary on KMLP's own accord or use of a third party, as

solely determined by KMLP, at Shipper's sole cost and expense, to

treat and/or process the Gas stream such that the Gas stream can be

delivered to the downstream pipeline. Until remedial action is

taken to make Gas acceptable to the downstream pipeline, KMLP may

refuse to accept receipt of any Gas, in KMLP's sole discretion,

which prevents KMLP from making deliveries into the downstream

pipeline. KMLP shall not have any obligation to provide service

with respect to Gas which does not satisfy the requirements of this

Section 19. Any reduction in the energy content of the Gas treated

and/or processed shall be determined and deducted from KMLP's

transportation volumes tendered for delivery to the downstream

pipeline.