Kinder Morgan Louisiana Pipeline LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2009, Docket: RP09-257-000, Status: Effective

Original Sheet No. 209 Original Sheet No. 209

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

Replacement Shipper's Contract Number, the quantity of capacity

being recalled, and the Offer Number or Award Number, if necessary

to uniquely identify the capacity being recalled. For recalls that

are effective at non-standard times, the appropriate recall

notification period is to be included in the subject line and the

effective time of the recall is to be in the body of the E-mail. If

KMLP allows capacity recall notification mechanisms in addition to

Internet E-mail, the notification is to include at least the same

level of information. Affected Replacement Shippers are to manage

internal distribution of notifications of recall received from KMLP.

 

(2) The Releasing Shipper shall provide capacity

recall notification to KMLP through KMLP's Interactive Website. The

Releasing Shipper shall provide notice to its affected Replacement

Shipper at the same time it provides notification to KMLP. The

recall notification must specify the recall notification period for

the specified effective Day, as well as any other information needed

to uniquely identify the capacity being recalled. The mode of

notification is to be mutually agreed upon between the Releasing and

the Replacement Shipper.

 

(3) All recalled capacity notices must indicate

whether penalties will apply for the Day for which quantities are

reduced due to a capacity recall.

 

(d) QUANTITY ALLOCATION

 

In the event of an Intra-Day capacity recall, KMLP

shall determine the allocation of capacity between the Releasing

Shipper and the Replacement Shipper(s) based upon the Elapsed

Prorata Capacity (EPC). In any recall notification provided to

KMLP, the quantity should be expressed in terms of the adjusted

total released capacity entitlements based upon EPC. EPC means that

portion of the capacity that would have theoretically been available

for use prior to the effective time of the Intra-Day recall based

upon a cumulative uniform hourly use of the capacity. The amount of

the capacity allocated to the Replacement Shippers(s) should equal

the original released capacity less the recalled capacity that is

adjusted based upon the EPC. KMLP shall not be obligated to deliver

in excess of the total daily contract quantity of the release as a

result of any recall. The service flexibility available to either

the Releasing Shipper or the Replacement Shipper for the subject

capacity shall not be less as a result of the recall.