Kinder Morgan Louisiana Pipeline LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2009, Docket: RP09-257-000, Status: Effective

Original Sheet No. 190 Original Sheet No. 190

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

(1) The quantity of the capacity (in Dth per

Day) and the transportation path(s) [or segment(s) thereof] being

released, including identification by KMLP's PIN Number (or Common

Code) of the Receipt Points, Delivery Points defining the released

path/segment and the firm capacity to be released at each such

point;

 

(2) The fixed reservation charge and/or volumetric

charge the Prearranged Shipper has agreed to pay for the released

capacity;

 

(3) Whether the capacity being released is subject

to recall and/or reput in the Prearranged Release and, if so, the

exact conditions of such recall and/or reput (which conditions must

conform with Sections 14.5 and 14.14); and

 

(4) The proposed effective date of the Prearranged

Release and the proposed term of the Prearranged Release.

 

(c) Whether the Releasing Shipper will accept Qualified

Bids which are contingent on subsequent events (such as the purchase

of upstream or downstream capacity), and if so, what events and the

last date by which such contingency must be fulfilled;

 

(d) Whether the Releasing Shipper will accept Qualified

Bids with longer terms or larger volumes, and if so, what is the

maximum volume and the longest term the Releasing Shipper will

accept;

 

(e) Whether the Releasing Shipper wants KMLP to actively

market its capacity rights subject to the Prearranged Release

pursuant to Section 15 of these General Terms and Conditions;

 

(f) The starting date for and the length of time for the

open season (which must conform to Section 14.7) and the length of

time [consistent with Section 14.9(b)] for the Prearranged Shipper

to be able to match a winning Qualified Bid;

 

(g) Whether the Releasing Shipper will accept Qualified

Bids whose revenues will vary by the volume transported, and if so,

any minimum amount to be billed as a reservation charge even if

there is no flow (or insufficient flow);