GENERAL TERMS AND CONDITIONS
----------------------------
1.38 TIE-IN FACILITIES
"Tie-In Facilities" shall mean the pipeline and
appurtenant metering facilities connecting Leg 1 and Leg 2 with bi-
directional meter and flow capability.
1.39 UNACCOUNTED FOR GAS
"Unaccounted For Gas" shall mean the thermal equivalent of
the difference between the sum of all input volumes of Gas to the
System and the sum of all output volumes of Gas from the System,
which difference shall include but shall not be limited to Gas
vented (other than gas that can be attributed to an offending
Shipper) and Gas lost as a result of an event of Force Majeure, the
ownership of which cannot be reasonably identified. Unaccounted For
Gas shall not include Line Heater Gas or Fuel Gas (to the extent
that compression is installed), which will be separately determined.
Unaccounted For Gas shall be determined pursuant to Section 36 of
these General Terms and Conditions.
1.40 UNAUTHORIZED GAS
"Unauthorized Gas" shall mean volumes delivered to or on
behalf of Shipper at a Delivery Point in excess of confirmed
nominations.
1.41 YEAR
"Year" shall mean a period of three hundred sixty-five
(365) consecutive days or three hundred sixty-six (366) consecutive
days if such period includes February 29.