Kinder Morgan Louisiana Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2009, Docket: RP09-257-000, Status: Effective
Original Sheet No. 36 Original Sheet No. 36
RATE SCHEDULE ITS
-----------------
5.3 (a) Unless otherwise agreed by contract, Shipper shall
reimburse KMLP within thirty (30) days after costs have been
incurred by KMLP for all fees required by the FERC or any regulatory
body including, but not limited to, filing, reporting, and
application fees to the extent such fees are specifically related to
service for that Shipper hereunder and are not generally applicable
fees (such as general rate case filing fees).
(b) Unless otherwise agreed by contract, if KMLP
constructs, acquires or modifies any facilities to perform service
hereunder, then , to the extent provided in Section 5 of the General
Terms and Conditions of this Tariff and pursuant to a separate
agreement, either:
(1) Shipper shall reimburse KMLP for the cost of
such facilities or facility modifications as described in the
General Terms and Conditions of this Tariff; or
(2) KMLP shall assess a Monthly charge reflecting
such facility costs.
5.4 The ACA charge will be assessed, when applicable, as
provided in the General Terms and Conditions of this Tariff, on
volumes received by KMLP from Shipper under this Rate Schedule ITS.
5.5 (a) Unless otherwise provided by contract, KMLP shall
have the unilateral right to file with any appropriate regulatory
authority and make changes effective in: (1) the rates and charges
applicable under this Rate Schedule ITS, including both the level
and design of such rates and charges; or (2) the terms and
conditions of this Rate Schedule ITS, including the applicable
General Terms and Conditions.