MidContinent Express Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective
Original Sheet No. 304 Original Sheet No. 304
EXHIBIT B
DATED ............
Company:
Contract No.:
Delivery Point(s):
[FTS Only]
MDQ
Name / Location County/Parish Area State PIN No. (Dth)
---------------------------------------- ------------------- ------ ------- -------
PRIMARY DELIVERY POINT(S):
1. .................................... .................. ...... ....... ......
....................................
....................................
....................................
SECONDARY DELIVERY POINT(S):
2. .................................... .................. ...... ....... ......
....................................
....................................
....................................
Delivery Pressure, Assumed Atmospheric Pressure
-----------------------------------------------
Gas to be delivered by MEP to Shipper, or for Shipper's account, at the Delivery Point(s)
shall be at the pressures available in MEP's pipeline facilities from time to time. The measuring
party shall use or cause to be used an assumed atmospheric pressure corresponding to the elevation at
such Delivery Point(s).