MidContinent Express Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective
Original Sheet No. 264 Original Sheet No. 264
GENERAL TERMS AND CONDITIONS
----------------------------
(i) Commence or increase supply inputs into
MEP's System or at specific Points, or shift such supply inputs (in
whole or in part) to different Points.
(ii) Cease or reduce supply inputs into MEP's
System or at specific Points.
(iii) Commence or increase takes of Gas from
MEP's System or from specific Points, or shift takes to different
Points.
(iv) Cease or reduce takes from MEP's System
or at specific Points.
(v) Maintain flows on a ratable basis
throughout the Day.
(vi) Rectify transportation imbalances.
(vii) Conform receipts or deliveries to the
confirmed nominations, for any Shipper with a variance greater than a
level stated in the Operational Flow Order.
(viii) Activate voluntary action agreement(s)
previously entered into, including any related compensation.
(ix) Such other actions which would tend to
alleviate the situation to be addressed.
(4) No Shipper will be required under an Operational
Flow Order to exceed its MDQ and/or Point MDQ under its Agreements
with MEP.