MidContinent Express Pipeline LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective

Original Sheet No. 208 Original Sheet No. 208

 

GENERAL TERMS AND CONDITIONS

----------------------------

 

under Section 14.9 before the release transaction is to commence. A

Releasing Shipper may not rollover, extend or in any way continue a

Short-term Prearranged Release exempt from bidding under subsection

(b) hereof with the same Replacement or Sub-replacement Shipper until

twenty-eight (28) days after the Short-term Prearranged Release has

ended unless the Releasing Shipper complies with the Capacity Release

Request provisions in Sections 14.3 and 14.4, or the re-release

qualifies for any of the other exemptions from bidding, referenced in

subsections (a), (c) or (d) hereof.

 

14.7 POSTINGS; OPEN SEASON

 

(a) A Capacity Release Request received by MEP via EDI

(which is applicable only for Prearranged Capacity Release Request)

or through the Interactive Website prior to the starting time of the

open season requested by the Releasing Shipper in its Capacity

Release Request in conformance with this Section 14 shall be posted

on the Informational Postings portion of MEP's Interactive Website as

requested. The posting shall contain the information contained in the

Capacity Release Request, except that the minimum price in any

minimum price condition requested to be held confidential by the

Releasing Shipper (but not the existence of the minimum bid

condition), shall be kept confidential and shall not be posted. The

posting shall also include the maximum reservation charge (including

all reservation surcharges) applicable to the capacity subject to the

Capacity Release Request, the beginning and ending time for the open

season and the time the notice was posted. MEP shall post the

Capacity Release Request upon receipt, unless the Releasing Shipper

requests otherwise. If the Releasing Shipper requests a posting time,

MEP will comply with that request as long as it comports with the

deadlines set forth in this Section 14.

 

(b) An open season shall consist of: (1) a one (1)

hour period on a Business Day between 12:00 p.m. and 1:00 p.m.

Central Clock Time or (2) any number (no fractions) of Business Days

running from 12:00 p.m. Central Clock Time on a Business Day to 1:00

p.m. Central Clock Time on the following Business Day, as requested

by the Releasing Shipper in its Capacity Release Request; provided,

however, that any capacity release for a period of one (1) Year or

longer must have an open season of at least three (3) Business Days,

each running from 12:00 p.m. Central Clock Time on a Business Day to

1:00 p.m. Central Clock Time two (2) Business Days later.