GENERAL TERMS AND CONDITIONS
----------------------------
3. RECEIPT POINTS
3.1 FACILITIES AT RECEIPT POINTS
Unless otherwise agreed by MEP, MEP shall own, operate
and maintain all pipeline and measurement facilities necessary to
receive and measure Gas hereunder. In the event any such facilities
are installed by MEP, Section 5 of these General Terms and
Conditions shall apply.
3.2 OBLIGATION
Except as otherwise provided in this Tariff, MEP's
maximum obligation to receive Gas at a Receipt Point under an FTS
Agreement shall not exceed the lesser of: (a) the applicable Point
MDQ at that Receipt Point (plus applicable Fuel Gas and Unaccounted
For Gas) as specified in the Agreement or as applicable at such
Receipt Point under this Tariff; or (b) the total daily volume
Shipper or its designee is able and willing to tender at the Receipt
Point.
3.3 LOCATION
Unless otherwise described in the Agreement, the Receipt
Point(s) for transportation Agreements shall be located at the
interconnection between the facilities of Shipper, or its designee,
and the facilities of MEP.