MidContinent Express Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective
Original Sheet No. 114 Original Sheet No. 114
GENERAL TERMS AND CONDITIONS
----------------------------
2. PRIORITY OF SERVICE
2.1 ALLOCATION OF CAPACITY
(a) GENERAL
This Section 2.1 governs the allocation of firm
capacity on MEP's System among entities requesting firm services in
assigning priority to otherwise valid requests for any particular
firm service. In applying such criteria where a Negotiated Rate or
Negotiated Rate Formula is involved, the value assigned to a request
which includes a Negotiated Rate or Negotiated Rate Formula shall be
limited by the Recourse Rate as provided in Section 30 of these
General Terms and Conditions. MEP shall not be required to grant
otherwise valid requests at less than the applicable maximum rate,
but may do so on a non-discriminatory basis.
(b) CAPACITY AWARD PROCEDURES
This Section 2.1(b), together with Sections 2.1(c)
and 16 of these General Terms and Conditions, sets out the
procedures to be followed by MEP in awarding all firm forward-haul
transmission capacity becoming available on its System; provided,
however, that these procedures do not apply to the initial
allocation of such firm capacity created by the construction of new
facilities (including the initial construction and any extensions
and expansions of MEP's System). The allocation of Preapproved
Capacity is subject to contractual provisions entered into with
Foundation Shippers pursuant to Section 2.7 of Rate Schedule FTS.
(1) INITIAL OPEN SEASON
MEP shall conduct an Initial Open Season for
all firm forward-haul transmission capacity becoming available on
its System; provided, however, that the Initial Open Season
procedure shall not apply (and the capacity shall not be considered
as available or becoming available) where an existing Shipper has
the right of first refusal or other rollover right under Section 16
of these General Terms and Conditions unless and until all such
rollover rights have expired or, if the right of first refusal is
exercised, the right of first refusal process has concluded and the
capacity has not been awarded; and provided further that the
allocation of capacity shall be subject to contractual provisions
entered into with Foundation Shippers pursuant to Section 2.7 of
Rate Schedule FTS.