MidContinent Express Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective
Original Sheet No. 57 Original Sheet No. 57
RATE SCHEDULE PALS
------------------
6. QUANTITY
Each PALS Request Order shall specify in Dth the MAQ and a
daily schedule of the quantities (including the MDQ) to be parked
and/or loaned under the specific transaction. The daily schedule
of returned volumes by the Shipper or MEP shall also be specified
in the PALS Request Order. The quantities may be specified as a
range of volumes (maximum and minimum aggregate and daily
quantities and the related time periods) to be parked and/or loaned
and returned, and the schedule may include the flexibility to do
either a park or a loan within specified volume and time limits.
The schedule may provide for flexibility in total volumes and in
the daily volumes parked and/or loaned, in the timing of the park
or the loan (or any portion thereof), in the duration of the park
and/or loan (or any portion thereof) and/or the timing of the
completion of the park or loan (or any portion thereof) by the
return of gas to the Shipper or to MEP, and shall specify the
limits of the flexibility allowed. Subject to the flexibility
specified in the PALS Request Order, the MDQ RO shall be the
maximum quantity MEP is obligated, on an interruptible basis, to
receive from or deliver to Shipper under the PALS Request Order on
the specified day. The MAQ RO shall be the maximum aggregate
quantity MEP is obligated to hold or loan for the account of
Shipper under the RO. The minimum aggregate and daily volumes to
be parked and/or loaned and returned on an interruptible basis
shall also be specified in the PALS Request Order. The sum total
of a Shipper's MAQ ROs and MDQ ROs shall not exceed the MAQ and MDQ
specified in the PALS Agreement. If a Shipper exceeds the MDQ or
MAQ in the PALS Agreement or fails to comply with any quantity or
timing parameter in the applicable PALS Request Order (unless such
failure is due to MEP not confirming a nomination properly
submitted), it shall be subject to overrun charges.