MidContinent Express Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/10/2009, Docket: RP09-136-000, Status: Effective
Original Sheet No. 54 Original Sheet No. 54
RATE SCHEDULE PALS
------------------
5. RATE
5.1 (a) Unless otherwise mutually agreed by MEP and
Shipper, Shipper shall pay MEP under this Rate Schedule PALS a
Usage Charge multiplied by the total quantity of gas either parked
or borrowed each Day for the account of Shipper during the Month.
The maximum Usage Charge shall be the applicable maximum unit rate
set out in this Tariff multiplied by the quantity of Gas parked or
borrowed in the aggregate for all Days in the Month.
(b) Where a Shipper has agreed to pay a Negotiated
Rate or a rate under a Negotiated Rate Formula, the rates assessed
hereunder shall be governed by Section 30 of the General Terms and
Conditions of this Tariff.
5.2 (a) Unless otherwise agreed by contract, Shipper
shall reimburse MEP within thirty (30) days after costs have been
incurred by MEP for all fees required by the FERC or any
regulatory body including, but not limited to, filing, reporting,
and application fees to the extent such fees are specifically
related to service for that Shipper hereunder and are not
generally applicable fees (such as general rate case filing fees).
(b) Unless otherwise agreed by contract, if MEP
constructs, acquires or modifies any facilities to perform service
hereunder, then, to the extent provided in Section 5 of the
General Terms and Conditions of this Tariff and pursuant to a
separate agreement, either:
(1) Shipper shall reimburse MEP for the cost of
such facilities or facility modifications as described in the
General Terms and Conditions of this Tariff; or
(2) MEP shall assess a Monthly charge reflecting
such facility costs.
5.3 The ACA charge will be assessed, when applicable, as
provided in the General Terms and Conditions of this Tariff, on
volumes received by MEP from Shipper under this Rate Schedule
PALS.