13.4 CHDP Calculation. White River shall perform the CHDP

calculations using an industry recognized equation of state and natural gas

chromatograph compositional analysis through C9. In the event of a dispute

over calculated CHDP temperature at a given receipt point, White River's

calculated value shall control unless the disputing party can clearly

identify the cause of the error.

 

13.5 If any gas tendered for receipt by White River fails at any time

to conform to any of the quality specifications set forth in §§ 13.1 through

13.3, White River may refuse to accept receipt of the non-conforming gas

until the gas meets the quality specifications. White River's refusal to

accept non-specification gas does not relieve Shipper of any of its

obligations under this tariff. White River will attempt to notify a Shipper

when Shipper's gas does not conform to White River's specifications.

 

13.6 Shipper shall indemnify White River and hold it harmless from all

suits, actions, regulatory proceedings, damages, costs, losses and expenses

(including reasonable attorney fees) arising out of the failure of the gas

tendered by Shipper to conform to the quality specifications set forth in §§

13.1 through 13.3, including any injury or damage done to White River's

facilities. White River may elect to accept any off-specification gas in the

quantities and at the time periods as White River determines will not

adversely affect or hamper White River's ability to provide service under

this tariff.

 

13.7 Acceptance of gas that does not conform to these specifications is

at the election of White River, and acceptance of the gas does not constitute

any waiver of White River's right to refuse to accept similarly nonconforming

gas.

 

13.8 White River will not be required to schedule delivery of gas into

its system at any receipt point if a downstream pipeline or third party

refuses to confirm the nomination because the gas fails to satisfy the

downstream pipeline's gas quality standards.