13.4 CHDP Calculation. White River shall perform the CHDP
calculations using an industry recognized equation of state and natural gas
chromatograph compositional analysis through C9. In the event of a dispute
over calculated CHDP temperature at a given receipt point, White River's
calculated value shall control unless the disputing party can clearly
identify the cause of the error.
13.5 If any gas tendered for receipt by White River fails at any time
to conform to any of the quality specifications set forth in §§ 13.1 through
13.3, White River may refuse to accept receipt of the non-conforming gas
until the gas meets the quality specifications. White River's refusal to
accept non-specification gas does not relieve Shipper of any of its
obligations under this tariff. White River will attempt to notify a Shipper
when Shipper's gas does not conform to White River's specifications.
13.6 Shipper shall indemnify White River and hold it harmless from all
suits, actions, regulatory proceedings, damages, costs, losses and expenses
(including reasonable attorney fees) arising out of the failure of the gas
tendered by Shipper to conform to the quality specifications set forth in §§
13.1 through 13.3, including any injury or damage done to White River's
facilities. White River may elect to accept any off-specification gas in the
quantities and at the time periods as White River determines will not
adversely affect or hamper White River's ability to provide service under
this tariff.
13.7 Acceptance of gas that does not conform to these specifications is
at the election of White River, and acceptance of the gas does not constitute
any waiver of White River's right to refuse to accept similarly nonconforming
gas.
13.8 White River will not be required to schedule delivery of gas into
its system at any receipt point if a downstream pipeline or third party
refuses to confirm the nomination because the gas fails to satisfy the
downstream pipeline's gas quality standards.