Original Sheet No. 124 Original Sheet No. 124

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

13.2 Cricondentherm Hydrocarbon Dew Point (CHDP).

 

(a) CHDP Limit - White River will accept all deliveries of

natural gas at a CHDP equal to or less than 15° Fahrenheit, provided that

such gas satisfies all other applicable provisions of White River's FERC Gas

Tariff.

 

(b) CHDP Operating Limit - White River may, from time to time,

as operationally feasible, establish and post on its internet web site a CHDP

Operating Limit that is higher than the CHDP Limit for natural gas received

into its system. White River's ability to establish and post higher CHDP

Operating Limits will depend on pipeline operating characteristics such as

pressures and temperatures, blending capability of prevailing and expected

gas supplies and proximity to interconnecting pipelines.

 

(c) White River shall not be obligated to accept gas into its

system that exceeds the applicable CHDP limit. The existence of a CHDP limit

shall not be deemed to negate, reduce or limit White River's authority to

issue operational flow orders. To the extent operationally practicable,

White River may waive a CHDP limit for gas received from certain points on

its system provided such waiver is made on a non-discriminatory basis.

 

 

13.3 CHDP Operating Limit Posting Procedure.

 

(a) White River may post a CHDP Operating Limit at or above the

CHDP Limit. The posted CHDP Operating Limit will apply to all receipt

points. White River will provide as much prior notice of changes to its CHDP

Operating Limits as possible and attempt to provide at least two days notice

prior to the timely cycle nomination deadline. However, White River may

reduce the CHDP Operating Limit to the CHDP Limit at any time without notice,

when operationally necessary. In such event, White River will post a

critical notice on its Internet web site.

 

(b) For receipt points with online chromatographs, White River

shall post on its internet web site the prior gas day average and maximum

calculated CHDP at each receipt point. For receipt points without online

chromatographs, once per month White River shall post on its internet web

site the average and maximum calculated CHDP at each receipt point for the

prior month period. Compliance with CHDP limits will be determined based on

calculated current flowing CHDP temperatures.