White River Hub, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-645-000, Status: Effective
Original Sheet No. 103 Original Sheet No. 103
GENERAL TERMS AND CONDITIONS
(Continued)
(b) White River shall provide Shipper as much advance notice of
any curtailment or interruption as is practicable under the circumstances.
White River will support notification, to be designated by Shipper, through
the following channels: (1) available on the Customer Activities Web site
Shipper web reports and/or (2) up to two internet e-mail addresses provided by
Shipper or (3) additional electronic notification specified by Shipper. Such
notice shall state the reduced quantities of gas that White River estimates it
will be able to transport for Shipper and the estimated duration of the
curtailment or interruption.
(c) If curtailment or interruption is required, White River and
Shipper shall cooperate to the extent possible in making adjustments to
receipts or deliveries to minimize injury to any property or facilities.
(d) Nothing in this provision shall limit White River's right to
curtail or interrupt service on any other reasonable basis (including pro rata
curtailment or interruption within a class of service) in order to ensure
system integrity or to reflect the operational characteristics of White
River's system.
9.3 Curtailment and Interruption Liability. White River shall not be
liable for loss or damage caused by any curtailment or interruption of
service, except to the extent directly caused by White River's negligence,
misfeasance or willful misconduct. Further, White River shall not be liable
for any indirect, incidental, or consequential loss or damages arising from
any curtailment or interruption of service except to the extent such damages
are caused by White River's gross negligence, misfeasance, or willful
misconduct.