White River Hub, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-645-000, Status: Effective
Original Sheet No. 56 Original Sheet No. 56
GENERAL TERMS AND CONDITIONS
(Continued)
1.44 Shipper means any party who (a) is receiving service according to
an effective rate schedule under this tariff, (b) has executed a service
agreement under any rate schedule, or (c) has completed a request for service
under Rate Schedules FT, RGS or IT.
1.45 System means the pipeline and appurtenant facilities and related
facilities owned by White River.
1.46 Time means that references to time in all parts of this tariff are
Central Clock Time, unless otherwise noted.
1.47 Unaccounted-for gas means that volume of gas which is the
difference between the sum of all input volumes of gas to the system and the
sum of all output volumes of gas from the system during a month, including,
but not be limited to, (a) gas vented and (b) gas lost as a result of a force
majeure event, the ownership of which cannot be reasonably identified.
1.48 Unauthorized overrun means that quantity of gas that Shipper
delivers to or receives from White River in excess of Shipper's RDC without a
prior confirmed nomination.
1.49 White River means White River Hub, LLC.
1.50 Year means a period of 365 consecutive days beginning noon January
1, or 366 consecutive days if such period includes February 29, unless
otherwise specified.