White River Hub, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2008, Docket: RP08-645-000, Status: Effective

Original Sheet No. 51 Original Sheet No. 51

 

GENERAL TERMS AND CONDITIONS

 

The following General Terms and Conditions apply to transportation

services provided under this tariff.

 

1. DEFINITIONS

 

1.1 Alternate delivery point means any point where gas is delivered

out of White River's system that is not listed as a primary delivery point in

Shipper's Rate Schedule FT or RGS transportation service agreement.

 

1.2 Alternate receipt point means any point where gas is received into

White River's system that is not listed as a primary receipt in Shipper's Rate

Schedule FT or RGS transportation service agreement.

 

1.3 Authorized overrun means that quantity of gas authorized by White

River in excess of the reserved capacity specified in the applicable

transportation service agreement.

 

1.4 Bidding period means that period of time that released firm

capacity is posted on White River's informational postings and Customer

Activities Web site during which shippers may bid for capacity.

 

1.5 Bidding shipper means any shipper that is qualified to bid for

capacity via White River's Customer Activities systems.

 

1.6 Btu means British thermal unit. That is the amount of heat

required to raise the temperature of one pound of water one degree from 59

degrees to 60 degrees Fahrenheit. MMBtu means 1,000,000 Btu's.

 

1.7 Capacity release means the release by a firm Shipper of its

capacity.

 

1.8 Central Clock Time or CCT means central standard time when

daylight savings time is not in effect and central daylight time when daylight

savings time is in effect.

 

1.9 CHDP Limit means the temperature set forth in §13.2(a) at which

White River will accept all deliveries of natural gas provided that such gas

satisfies all other applicable provisions of White River's FERC Gas Tariff.

 

1.10 CHDP Operating Limit means the CHDP temperature that is at or

above the CHDP Limit that White River is willing to accept on a temporary

basis as operationally feasible given transitory operating conditions. In no

case will the CHDP Operating Limit be set lower that the CHDP Limit.