Transcolorado Gas Transmission Company LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/2007, Docket: RP08-167-000, Status: Effective
Original Sheet No. 275 Original Sheet No. 275 : Effective
GENERAL TERMS AND CONDITIONS
12. BALANCING OF GAS (Continued)
(a) The monthly FGRP for Phase I Shippers will be calculated
using the most recent available actual data and will be equal to (i) plus
(iii) of this section. The monthly FGRP for Phase II shippers will be
calculated using the most recent available actual data and be equal to (i)
plus (ii) plus (iv)of this section.
(i) Projected monthly lost and unaccounted-for component of
the FGRP will equal (i)(1) divided by (i)(2):
(1) Projected transmission system losses or gains and
unaccounted-for quantities will be calculated by subtracting the physical
transmission deliveries for the month, two months previous to the projected
month, including actual system gas consumed, from corresponding physical
transmission receipts as adjusted for anticipated changes in system
operations.
(2) Sum of projected monthly scheduled Phase I, Phase
II and North Expansion Transportation receipt quantities. Projected monthly
scheduled transportation receipts will be based on the scheduled Phase I,
Phase II and North Expansion Transportation transmission receipt quantities
for the month, two months previous to the projected month, as adjusted for
anticipated changes in system operations.
(ii) Projected monthly system gas consumption. Projected
transmission system gas consumption will be based on the actual fuel consumed
at each compressor station (excluding fuel gas consumption applicable to North
Expansion Transportation), extraction plant or other fuel consuming facility
for the month, two months previous to the projected month, as adjusted for
anticipated changes in system operations divided by projected monthly
scheduled Phase II transportation receipt quantities. Projected monthly
scheduled transportation receipts will be based on the scheduled transmission
receipt quantities for the month, two months previous to the projected month,
as adjusted for anticipated changes in system operations.
(iii) Phase I prior 12 months ending December 31 variance
adjustment. The variance adjustment for each 12 months ending December 31
shall be: the sum of Phase I Shippers' proportionate share of the 12 months'
lost or gained and unaccounted-for quantities, less the sum of the 12 months'
Phase I Shippers' FGRP quantity collected, as adjusted to exclude the variance
adjustment component of the FGRP plus the unamortized balance at December 31;
all divided by actual Phase I Shippers' annual transportation volumes for the
12 months ended December 31, as adjusted for anticipated changes in system
operations. Monthly variances will be accumulated in the appropriate
accounts. The variance adjustment component of the FGRP will be used to
amortize the previous 12 months ended December 31 variance account balance
over the 12-month period April 1 through March 31.