National Fuel Gas Supply Corporation

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/1997, Docket: RP97-201-000, Status: Effective

First Revised Sheet No. 131U First Revised Sheet No. 131U : Superseded

Superseding: Original Sheet No. 131U

P-1 RATE SCHEDULE

Hub Service - Parking Schedule

 

 

2. APPLICABILITY AND CHARACTER OF SERVICE (Cont'd)

 

2.7 Service under this P-1 Rate Schedule shall be provided on a basis

that is equal in quality for all P-1 Services hereunder, whether or

not gas is purchased from Transporter.

 

3. RATE

 

3.1 The maximum and minimum rates for Parking are set forth on the

currently effective Sheet No. 6 of this tariff. These rates shall

be applicable to service hereunder, unless Transporter and Shipper

have agreed upon a negotiated rate pursuant to Section 17.2 of the

General Terms and Conditions of this Tariff. These rates include a

First Day charge for the quantities of gas for the day of injection

and a charge for such subsequent day until withdrawal, on a first-

in first-out basis. The current Posted Rate (ranging between the

maximum and minimum rates) will be posted on Transporter's

Electronic Bulletin Board, which is subject to periodic changes.

Shipper shall pay the current Posted Rate on the date the Shipper's

Service Request Form is received, as verified by telephone

approval, and Shipper's P-1 service agreement will be deemed to be

so amended.

 

3.2 If during the term of a Parking service agreement, Transporter

posts a lower current Posted Rate on the Electronic Bulletin Board,

Shipper's service agreement will be deemed amended to reduce the

rate to the current Posted Rate for the remaining term of the

Nomination; provided, however, if the current Posted Rate is

subsequently increased during the term of that Nomination, the P-1

Service Agreement will be deemed amended for the remaining term of

the nomination to reflect the increased rate but no more than the

then-current Posted Rate at the commencement of such Nomination.

 

3.3 During injection of gas hereunder, Transporter will also retain a

quantity of gas equal to the product obtained by multiplying the

quantity of gas received by Transporter for injection under this P-

1 Rate Schedule by the percentage set forth on Sheet No. 6 as

"surface operating allowance", except as provided in Subsection 3.5

hereof.