National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1997, Docket: RP97-201-000, Status: Effective
First Revised Sheet No. 131U First Revised Sheet No. 131U : Superseded
Superseding: Original Sheet No. 131U
P-1 RATE SCHEDULE
Hub Service - Parking Schedule
2. APPLICABILITY AND CHARACTER OF SERVICE (Cont'd)
2.7 Service under this P-1 Rate Schedule shall be provided on a basis
that is equal in quality for all P-1 Services hereunder, whether or
not gas is purchased from Transporter.
3. RATE
3.1 The maximum and minimum rates for Parking are set forth on the
currently effective Sheet No. 6 of this tariff. These rates shall
be applicable to service hereunder, unless Transporter and Shipper
have agreed upon a negotiated rate pursuant to Section 17.2 of the
General Terms and Conditions of this Tariff. These rates include a
First Day charge for the quantities of gas for the day of injection
and a charge for such subsequent day until withdrawal, on a first-
in first-out basis. The current Posted Rate (ranging between the
maximum and minimum rates) will be posted on Transporter's
Electronic Bulletin Board, which is subject to periodic changes.
Shipper shall pay the current Posted Rate on the date the Shipper's
Service Request Form is received, as verified by telephone
approval, and Shipper's P-1 service agreement will be deemed to be
so amended.
3.2 If during the term of a Parking service agreement, Transporter
posts a lower current Posted Rate on the Electronic Bulletin Board,
Shipper's service agreement will be deemed amended to reduce the
rate to the current Posted Rate for the remaining term of the
Nomination; provided, however, if the current Posted Rate is
subsequently increased during the term of that Nomination, the P-1
Service Agreement will be deemed amended for the remaining term of
the nomination to reflect the increased rate but no more than the
then-current Posted Rate at the commencement of such Nomination.
3.3 During injection of gas hereunder, Transporter will also retain a
quantity of gas equal to the product obtained by multiplying the
quantity of gas received by Transporter for injection under this P-
1 Rate Schedule by the percentage set forth on Sheet No. 6 as
"surface operating allowance", except as provided in Subsection 3.5
hereof.