National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1997, Docket: RP97-201-000, Status: Effective
First Revised Sheet No. 104 First Revised Sheet No. 104 : Superseded
Superseding: Original Sheet No. 104
ESS RATE SCHEDULE
Enhanced Storage Service
3. RATE (Cont'd)
3.4 During withdrawal of gas hereunder, Transporter will retain a
quantity of gas equal to the product obtained by multiplying the
quantity of gas withdrawn by the percentage set forth on Sheet No.
6 as "surface operating allowance."
3.5 Except as provided by valid rule or regulation, Transporter is not
obligated to offer to store or store gas at any rates less or
allowances than the maximum rates and allowances specified for this
rate schedule on Sheet No. 6; however, nothing precludes Transport-
er from charging a rate between the maximum and minimum rate or
retaining an allowance less than the allowance specified for
service under this Rate Schedule as set forth on Sheet No. 6.
4. MINIMUM MONTHLY BILL
The minimum monthly bill shall be the sum of the Storage Demand Charge
and the Storage Capacity Charge.
5. BILLING ADJUSTMENTS
If during the Injection Period Transporter is unable to inject into
storage quantities of gas nominated during such period by Shipper for
injection and made available to Transporter, then the Storage Demand
Charge and the Storage Capacity Charge shall be reduced in the following
manner:
If, at the end of the Injection Period, Shipper's Storage Gas Balance is
less than Shipper's Maximum Storage Quantity due solely to Transporter's
inability to inject gas within the limitations set forth in this Rate
Schedule, then the Storage Capacity Charge applicable for the ensuing
Withdrawal Period and Injection Period shall be that part of the total
Storage Capacity Charge herein provided which Shipper's Storage Balance
as of such date bears to Shipper's Storage Capacity.