National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1993, Docket: RS92- 21-001, Status: Effective
Original Sheet No. 64 Original Sheet No. 64 : Superseded
EFT RATE SCHEDULE
Enhanced Firm Transportation Service
9.4 Storage Requirements (Cont'd.)
Transporter. Transporter's ability to transport quantities of gas
between Transporter's storages under the EFT Rate Schedule and particular
receipt and delivery points may be constrained by these field specific
capabilities.
In addition, during the injection cycle specific storages can only
be filled from a single interconnection to an upstream pipeline. In New
York; Nashville, Perrysburg, Sheridan and Colden storages can only be
filled from the facilities of Tennessee Gas Pipeline Company. Similarly,
in Pennsylvania; Hebron Storage can only be filled from Tennessee Gas
Pipeline Company.
Therefore, EFT Shippers who have upstream capacity on Tennessee Gas
Pipeline Company will have to arrange for quantities to be scheduled on
Tennessee Gas Pipeline Company for injection into these specific
storages.
STORAGE FIELD INJECTION CYCLE WITHDRAWAL CYCLE
(April 1 - October 31) (November 1 - April 15)
FLOW RANGE FLOW RANGE
MMCFD MMCFD MMCFD MMCFD
BELMOUTH 4.3 13 5 5
BENNINGTON 30 30 28.8 60
BOONE MTN. 10 10 5 5
COLDEN 40 40 25 40
COLLINS 3.5 11 20 40
CORRY 6.3 6.7 3.6 40
DEERLICK 0 0 0 0
DERBY 3 3 2 2
DUHRING 0 0 0 0
EAST BRANCH 25 50 25 35
ELLISBURG 72 90 110 225
GALBRAITH 12 12 6.5 16
HEBRON 30 30 25 25
HENDERSON 15 30 17.1 30
HOLLAND 20 20 10 20
KEELOR 30 30 13.5 40
LAWTONS 4 20 10 30
MARKLE 8 8 1.5 8
NASHVILLE 66 66 35 110
OWL'S NEST 3 10 3 3
PERRYSBURG 40 40 18 40