EFT RATE SCHEDULE

Enhanced Firm Transportation Service

 

9.3 Receipt Requirements

 

(a) At the following delivery points to National Fuel Gas

Distribution Corporation, requirements are served by

upstream pipeline connections which feed directly to the

Shipper's market. In these specific cases, Transporter

has no facilities through which to replace or supplement

natural gas deliveries, and the Shipper is restricted to

the pressures and quantities available from such

upstream pipelines, with whom National Fuel Gas

Distribution Corporation will contract directly for

transportation service. Transporter's delivery

obligation at such points will also be limited by

station capacities, which are listed below.

 

PRESSURE

INTERCONNECTING REQUIRMENT CAPACITY

PIPELINE METER NAME/LOCATION METER PSIG DT/DAY

 

CNG TRANSMISSION BELMONT 60185 125 2060

CNG TRANSMISSION CALEDONIA 60154 200 15450

CNG TRANSMISSION DONOVAN 60178 300 41200

CNG TRANSMISSION JOHNSONBURG 60047 200 1030

CNG TRANSMISSION SANFORD 60181 175 20600

CNG TRANSMISSION SILVER SPRINGS 60049 200 5150

CNG TRANSMISSION WEST WELLSVILLE 60179 200 10300

CNG TRANSMISSION WYOMING 60050 300 20600

COLUMBIA GAS TRANSMISSION SMETHPORT 630202 100 3100

TENNESSEE GAS PIPELINE COCHRANTON 2-0314 400 20600

TENNESSEE GAS PIPELINE CRANBERRY SALES 2-0703 400 36050

TENNESSEE GAS PIPELINE LEWISTON 2-0092 200 6000

TENNESSEE GAS PIPELINE MAYVILLE 2-0088 200 10300

TENNESSEE GAS PIPELINE SHARON 2-0069 400 70000

TENNESSEE GAS PIPELINE PEKIN 2-0326 200 51500

TENNESSEE GAS PIPELINE PETTIS 2-0071 400 30900

TENNESSEE GAS PIPELINE SHERMAN 2-0428 200 4120

TENNESSEE GAS PIPELINE TOWNVILLE 2-0390 400 10300

TENNESSEE GAS PIPELINE UNION CITY 2-0200 200 20600

 

(b) Transporter's delivery pressure obligations set forth in

Section 9.2 are subject to its Shippers meeting the

receipt pressure requirements set forth in this Section

9.3(b). National would attempt, but would not be

obligated, to maintain the delivery pressures set forth

in Section 9.2 if receipt pressures fall below the

requirements set forth in this Section 9.3(b).