National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1997, Docket: RP97-201-000, Status: Effective
First Revised Sheet No. 38 First Revised Sheet No. 38 : Superseded
Superseding: 2nd Sub. Original Sheet No. 38
EFT RATE SCHEDULE
Enhanced Firm Transportation Service
6. OPERATING PROTOCOL FOR EFT SERVICE (Cont'd.)
Pressure
Interconnecting Requirement Capacity
Pipeline Meter Name/Location Meter PSIG DT/Day
Texas Eastern Transmission Bristoria 0015 750 103000
Texas Eastern Transmission Bristoria 5054 750 103000
Three Rivers Pipeline Three Rivers P.L. TRP268 450 10000
Transcanada Pipelines Ltd Niagara 1-0902 725 236500
Transcontinental Gas Pipeline Leidy 4494 1100 400000
Transcontinental Gas Pipeline Leidy 3549 1100 400000
Transcontinental Gas Pipeline Wharton 6172 600 139050
Transcontinental Gas Pipeline Wharton 3261 600 139050
6.4 Storage Requirements
This section sets forth the range of injection and withdrawal
capabilities associated with each individual storage field operated
by Transporter. Transporter's ability to transport quantities of
gas between Transporter's storages under the EFT Rate Schedule and
particular receipt and delivery points may be constrained by these
field specific capabilities.
In addition, during the injection cycle specific storages can only
be filled from a single interconnection to an upstream pipeline.
In New York; Nashville, Perrysburg, Sheridan and Colden storages
can only be filled from the facilities of Tennessee Gas Pipeline
Company. Similarly, in Pennsylvania; Hebron Storage can only be
filled from Tennessee Gas Pipeline Company.
Therefore, EFT Shippers who have upstream capacity on Tennessee Gas
Pipeline Company will have to arrange for quantities to be
scheduled on Tennessee Gas Pipeline Company for injection into
these specific storages.