National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1997, Docket: RP97-201-000, Status: Effective
Second Revised Sheet No. 32 Second Revised Sheet No. 32 : Superseded
Superseding: First Revised Sheet No. 32
EFT RATE SCHEDULE
Enhanced Firm Transportation Service
6. OPERATING PROTOCOL FOR EFT SERVICE (Cont'd.)
Pressure Requirement (psig)
Meter Location Winter Summer
PSA02CWW01 Yankee Bush Road 25 25
PSA02CWW21 Follett Run 20 20
PSA02GLW11 Hemlock 26 26
PSA02GRE11 Barton Road 20 20
PSA02GRE31 Mark Road 34 34
PSA02GRE41 Gunnison Road 28 28
PSA02GRE51 Dutch Road 35 35
PSA02HMM21 Ludlow C.P.(LINE C3) 6 OZ 6 OZ
PSA02WYE41 Beaver Dam 39 39
PSA0300135 Skinner Hill 40 40
PSA0320095 Erie Control 47 20
PSA0320096 Erie Control S-42 47 20
PSA0320097 Erie Control S-42 47 20
PSA0321581 Warren City Plant 35 35
PSA0322221 Wrightsville 34 34
PSA0324501 Weiler Road 35 35
PSA0324521 Summit To Dist. 34 34
PSA03COE11 North Corry C.P. 37 37
PSA03COE21 Corry Jamestown 37 37
PSA03GRE21 Hammett 35 35
PSA03STW11 Sugar Grove C.P. 38 38
PSA03WYE21 Walker Road 53 53
PSA03WYE22 Walker Road 53 53
PSA0400312 Ludlow City Gate 6 OZ 6 OZ
PSA0422381 RgrTwn Line D W. RT6 24 24
PSA0423671 Ludlow City Plant 6 6
PSA0425741 Clymer Feed 53 53
PSA0426651 Keller Road 25 25
PSA04HMM31 Ludlow C.P.(W-1462) 6 OZ 6 OZ
PSA04HMM31 Ludlow C.P.(W-1462) 22 22
PSA04VGE11 Lowville 22 22
PSA04VGE12 Lowville 22 22
PSA04VGE21 Wattsburg 22 22
PSA04VGE22 Wattsburg 15 15