National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1996, Docket: TM97-1-16-000, Status: Effective
Alt. Eighth Revised Sheet No. 6A Alt. Eighth Revised Sheet No. 6A : Superseded
Superseding: Sub. Sixth Rev. Sheet No. 6A
Rate Base FERC Current
Sch. Rate Component Rate GRI 1/ ACA Rate 2/
(1) (2) (3) (4) (5) (6)
SS-1 Deliverability $6.5175 3/ - $6.5175
Capacity 0.0291 - - 0.0291
Injection/Withdrawal 0.0125 $0.0088 0.0023 0.0236
Excess Service 0.0125 - - 0.0125
Surface Operating
Allowance Charge 0.0106 - - 0.0106
SS-2 Deliverability 8.1470 3/ - 8.1470
Capacity 0.0260 - - 0.0260
Injection/Withdrawal 0.0106 0.0088 0.0023 0.0217
Excess Service 0.0125 - - 0.0125
Surface Operating
Allowance Charge 0.0106 - - 0.0106
1/ - Where applicable.
2/ - Surface Operating Allowance is 1.4%, where applicable.
3/ - GRI rates related to Reservation charges are based on load factors.
Greater than 50% = 26.0 cents/dth, less than 50% = 16.0 cents/dth.