National Fuel Gas Supply Corporation
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1996, Docket: TM97-1-16-000, Status: Effective
Fourteenth Rev. Sheet No. 6 Fourteenth Rev. Sheet No. 6 : Superseded
Superseding: Sub. Thirteenth Rev. Sheet No. 6
Rate Base FERC Current
Sch. Rate Component Rate GRI 1/ ACA Rate 3/
(1) (2) (3) (4) (5) (6)
ESS Demand (Max) $2.1400 4/ - $2.1400
(Min) 0.0000 - - $0.0000
Capacity (Max) 0.0432 - - $0.0432
(Min) 0.0000 - - $0.0000
Injection/ (Max) 0.0139 0.0088 0.0023 $0.0250
Withdrawal (Min) 0.0000 - - $0.0000
ISS Injection (Max) 1.0635 0.0088 0.0023 $1.0746
(Min) 0.0000 - - $0.0000
IAS Usage (Max)2/ 0.0028 - - $0.0028
(Min)2/ 0.0000 - - $0.0000
Advance/Return (Max) 0.0139 0.0088 0.0023 $0.0250
(Min) 0.0000 - - $0.0000
FSS Demand (Max) 2.1556 4/ - $2.1556
(Min) 0.0000 - - $0.0000
Capacity (Max) 0.0432 - - $0.0432
(Min) 0.0000 - - $0.0000
Injection/ (Max) 0.0139 0.0088 0.0023 $0.0250
Withdrawal (Min) 0.0000 - - $0.0000
P-1 First Day (Max) 0.0575 0.0088 0.0023 $0.0686
(Min) 0.0000 - - $0.0000
Each Subsequent (Max) 0.0071 - - $0.0071
Day (Min) 0.0000 - - $0.0000
P-2 First Day (Max) 0.0071 - - $0.0071
(Min) 0.0000 - - $0.0000
Each Subsequent (Max) 0.0071 - - $0.0071
Day (Min) 0.0000 - - $0.0000
1/ - Where applicable.
2/ - Unit Dt Rates per day.
3/ - Surface Operating Allowance is 1.4%, where applicable.
4/ - GRI rates related to Reservation charges are based on load factors.
Greater than 50% = 26.0 cents/dth, less than 50% = 16.0 cents/dth.