National Fuel Gas Supply Corporation
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/21/2010, Docket: RP10-504-000, Status: Effective
Third Revised Sheet No. 376 Third Revised Sheet No. 376
Superseding: Second Revised Sheet No. 376
GENERAL TERMS AND CONDITIONS
13. NOMINATING AND SCHEDULING TRANSPORTATION SERVICE (Cont'd.)
(d) Pooling at Appalachian Production Receipt Points. Any Shipper
or Operator may request the creation of a pool of certain
Appalachian production receipt points on Transporter's system
by submitting to Transporter, in writing on or before 9:00
central clock time the 20th day of the month preceding the
desired effective date, a Pool Operator Confirmation signed by
the Operators at each receipt point within the proposed pool
and, if different, by the proposed pool operator. A list of
the Appalachian production receipt points currently eligible
for pooling (which is subject to change from time to time in
Transporter's sole discretion), and the corresponding pooling
zone, can be obtained via the Web Site. Pools will be
established for a month and shall continue from month-to-month
thereafter until terminated by the pool operator or by
Transporter by notice at least ten days before the effective
date of termination. The Operator of a receipt point may
withdraw his point by notice to Transporter at least ten days
before the effective date of withdrawal. All the receipt
points in a single pool must be within one of the following
"pooling zones":
Pooling Zone Name State
N System (west of Henderson) PA
Other Pennsylvania Points PA
New York Points NY