National Fuel Gas Supply Corporation
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/21/2010, Docket: RP10-504-000, Status: Effective
First Revised Sheet No. 120 First Revised Sheet No. 120
Superseding: Original Sheet No. 120
ESS RATE SCHEDULE
Enhanced Storage Service
4. BILLING ADJUSTMENTS
If during the Injection Period Transporter is unable to inject into
storage quantities of gas nominated during such period by Shipper for
injection and made available to Transporter, then the Storage Demand
Charge and the Storage Capacity Charge shall be reduced in the
following manner:
If, at the end of the Injection Period, Shipper's Storage Gas Balance
is less than Shipper's Maximum Storage Quantity due solely to
Transporter's inability to inject gas within the limitations set forth
in this Rate Schedule, then the Storage Capacity Charge applicable for
the ensuing Withdrawal Period and Injection Period shall be that part
of the total Storage Capacity Charge herein provided which Shipper's
Storage Balance as of such date bears to Shipper's Storage Capacity.