Effective Date: 04/21/2010, Docket: RP10-504-000, Status: Effective

Second Revised Sheet No. 56 Second Revised Sheet No. 56

Superseding: First Revised Sheet No. 56

 

EFT RATE SCHEDULE

Enhanced Firm Transportation Service

 

 

4. OPERATING PROTOCOL FOR EFT SERVICE (Cont'd.)

 

Pressure

Interconnecting Requirement Capacity

Pipeline Meter Name/Location Meter PSIG DT/Day

 

Texas Eastern Transmission Bristoria 0015 750 103000

Texas Eastern Transmission Bristoria 5054 750 103000

Three Rivers Pipeline Three Rivers P.L TRP268 450 10000

TransCanada Pipelines Ltd. Niagara 1-0902 725 236500

Transcontinental Gas Pipe Line Leidy 4494 1100 400000

Transcontinental Gas Pipe Line Leidy 3549 1100 400000

Transcontinental Gas Pipe Line Wharton 6172 600 139050

Transcontinental Gas Pipe Line Wharton 3261 600 139050

 

 

 

4.4 Storage Requirements

 

This section sets forth the range of injection and withdrawal

capabilities associated with each individual storage field

operated by Transporter. Transporter's ability to transport

quantities of gas between Transporter's storages under the EFT

Rate Schedule and particular receipt and delivery points may be

constrained by these field specific capabilities.

 

In addition, during the injection cycle specific storages can only

be filled from a single interconnection to an upstream pipeline.

In New York; Nashville, Perrysburg, Sheridan and Colden storages

can only be filled from the facilities of Tennessee Gas Pipeline

Company. Similarly, in Pennsylvania; Hebron Storage can only be

filled from Tennessee Gas Pipeline Company.

 

Therefore, EFT Shippers who have upstream capacity on Tennessee

Gas Pipeline Company will have to arrange for quantities to be

scheduled on Tennessee Gas Pipeline Company for injection into

these specific storages.