National Fuel Gas Supply Corporation
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/21/2010, Docket: RP10-504-000, Status: Effective
Second Revised Sheet No. 55 Second Revised Sheet No. 55
Superseding: First Revised Sheet No. 55
EFT RATE SCHEDULE
Enhanced Firm Transportation Service
4. OPERATING PROTOCOL FOR EFT SERVICE (Cont'd.)
(b) Transporter's delivery pressure obligations set forth in
Section 4.2 are subject to its Shippers meeting the
receipt pressure requirements set forth in this Section
4.3(b). National would attempt, but would not be
obligated, to maintain the delivery pressures set forth
in Section 4.2 if receipt pressures fall below the
requirements set forth in this Section 4.3(b).
Pressure
Interconnecting Requirement Capacity
Pipeline Meter Name/Location Meter PSIG DT/Day
Dominion Transmission Ellisburg Station 60288 975 103000
Dominion Transmission Ellisburg Storage NFSTG 1000 103000
Dominion Transmission Eshbaugh 51052 400 27810
Dominion Transmission Leidy 4494 1100 50000
Dominion Transmission Leidy 3549 1100 50000
Dominion Transmission Marilla 2-0502 500 12360
Dominion Transmission Porterville 60051 400 139050
Columbia Gas Transmission Ellwood City 690533 700 26780
Columbia Gas Transmission First Fork 632291 500 36050
Columbia Gas Transmission Sugar Grove 617733 350 10300
Columbia Gas Transmission Waterford 620549 500 10300
Tennessee Gas Pipeline Clarence 2-0497 200 165000
Tennessee Gas Pipeline Colden Storage 6-0003 700 41200
Tennessee Gas Pipeline Coudersport 2-0074 400 51500
Tennessee Gas Pipeline East Aurora 2-0077 200 400000
Tennessee Gas Pipeline Hamburg (E. Eden) 2-0076 200 82400
Tennessee Gas Pipeline Hebron Storage 6-0001 700 41200
Tennessee Gas Pipeline Lamont 2-0072 400 30900
Tennessee Gas Pipeline Nashville Storage 2-0243 200 82400
Tennessee Gas Pipeline Rose Lake 2-0527 400 154500
Tennessee Gas Pipeline Rose Lake 1-0110 400 154500
Tennessee Gas Pipeline Mercer 2-0496 400 30900
Tennessee Gas Pipeline Wattsburg 2-0075 200 46350