National Fuel Gas Supply Corporation

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/15/2002, Docket: RP00-399-008, Status: Effective

Second Revised Sheet No. 36C Second Revised Sheet No. 36C : Effective

Superseding: First Revised Sheet No. 36C

 

FT-S RATE SCHEDULE

Firm Transportation Service - Seasonal

 

3. RATE (Cont'd.)

 

3.5 The applicable maximum and minimum rates for transportation

service utilizing a zone of Transporter's Niagara import point

project capacity are set forth on the currently effective Sheet

No. 8 of this tariff. The Niagara Zone I rate is applicable to

shippers with the Niagara import point as the primary receipt

point and primary delivery point(s) off the jointly-owned Niagara

Spur Loop Line, or any of the following pipelines of Transporter;

Line X (North of the Concord Compressor Station); Line U; Line U-

M2; Line XM-5-2; Line X-M2; Line NM-44; Line K (North of Station

BN-RS-15T); Line K-M2; and Line T (North of Station EN-RM-28T).

The Niagara Zone II rate is applicable to the further

transportation of gas subject to the Niagara Zone I rate to

primary delivery points off Transporter's Lines X, Y-M50 and Y-M2

between Concord, New York and Ellisburg, Pennsylvania. The

Niagara Zone III rate is applicable to the further transportation

of gas subject to the Niagara Zone I rate or the Niagara Zone I

and II rates to primary delivery points off Transporter's Lines

Y-M51, Y-M52, Y-M53 or Y-M7. The maximum and minimum rates

applicable to a transportation arrangement with a primary receipt

point at the Niagara import point and which utilizes capacity in

more than one zone of Transporter's Niagara import point project

capacity are the sum of the maximum and minimum rates applicable

to each zone. The maximum and minimum rates applicable to a

transportation arrangement with a primary receipt point at the

Niagara import point and which utilizes capacity in one or more

zones of Transporter's Niagara import point project capacity and

other capacity of Transporter are the sum of the Transporter's

generally applicable maximum and minimum rates applicable under

this FT-S Rate Schedule and the maximum and minimum Zone I

Niagara rate.

 

Shippers with a primary receipt point at the Niagara import point

and primary delivery point(s) within Niagara Zone I shall be

subject to a surcharge to Transporter's commodity charge (set

forth on Sheet No. 8 as "Zone I Secondary Point Surcharge") with

respect to gas delivered by Transporter at secondary delivery

points that are not within Niagara Zone I. When a Shipper with a

primary receipt point at the Niagara import point releases a

segment of its capacity pursuant to Section 10 of the General

Terms and Conditions, the maximum rates applicable to the

Replacement Shipper's use of that segment shall be the same as

the maximum rates applicable to a shipper with a primary receipt

point at one end of the segment and a primary delivery point at