Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/14/2010, Docket: RP10-375-000, Status: Effective
First Revised Sheet No. 628 First Revised Sheet No. 628
Superseding: Original Sheet No. 628
GENERAL TERMS AND CONDITIONS
(Continued)
adjustment pursuant to this Section 15.6 and shall be equal to the sum of (i)
the effective Base Applicable Shrinkage Percentage and (ii) the effective ASA
Percentage.
(1) Specified Calendar Periods
The Applicable Shrinkage Percentages for the ASA Rate Schedules shall be
established distinctly for the duration of four calendar periods as
follows:
(a) winter period - December 1 through March 31,
(b) spring, summer and fall periods - April 1 through November 30
(2) Base Applicable Shrinkage Percentages
The Base Applicable Shrinkage Percentages for ASA Rate Schedules are
reflected on the currently effective Statement of Rates for Percentages for
Applicable Shrinkage of this FERC Gas Tariff for each specified calendar
period applicable to all transportation and storage service rendered for
the specified service categories.
(B) Calculation of ASA Percentages:
ASA Percentages shall be calculated and filed pursuant to this Section 15.6 on
an annual basis as applicable to each service category for each calendar period
specified in Section 15.6 (A)(1) above. The ASA Percentages shall be calculated
as the differences obtained by subtracting from the Projected Shrinkage
Requirement Percentage for each such calendar period and service category the
corresponding Base Applicable Shrinkage Percentage.
(C) Projected Shrinkage Requirement Percentage:
With each filing hereunder for each specified calendar period and each service
category Pipeline shall calculate a Projected Shrinkage Requirement Percentage
as the quotient obtained by dividing (1) the projected annual quantities of fuel
and company use gas and gas lost as defined herein above for each specified
calendar period allocated to applicable service categories according to the then
currently effective method in use for allocating such costs on Pipeline's system
by (2) the projected annual transport and storage quantities for each service
category and for each specified calendar period.