Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/14/2010, Docket: RP10-375-000, Status: Effective
Fourth Revised Sheet No. 617 Fourth Revised Sheet No. 617
Superseding: Third Revised Sheet No. 617
GENERAL TERMS AND CONDITIONS
(Continued)
applicable Zone, rate schedule, and incremental service by the estimated
demand and commodity units to be billed weighted on the basis of the Base
Electric Power Cost Units for each applicable Zone, rate schedule, and
incremental service under all EPC Rate Schedules for the twelve Month
period beginning February 1. The EPC Surcharges for each applicable Zone,
rate schedule, and incremental service shall be rounded to the nearest
1/100 of a cent for commodity surcharges and 1/1000 of a dollar for demand
surcharges.
(5) Base Electric Power Cost Unit
The Base Electric Power Cost Unit for each applicable Zone, rate schedule,
and incremental service which are the unit Electric Power Costs included
in the Base Tariff Rates under Pipeline's EPC Rate Schedules shall be
reflected on the Statement of Rates for Effective Base Electric Power Cost
Units of this FERC Gas Tariff and the applicable Statement of Rates for
each incremental service.
(6) EPC Adjustment
The Current Unit EPC Change for each applicable Zone, rate schedule, and
incremental service computed in accordance with Section 15.1(B)(2) and the
EPC Surcharge computed in accordance with Section 15.1(B)(4) above shall
be added to the applicable demand and commodity components of Pipeline's
EPC Rate Schedules and the last previous units computed under the same
sections, which are contained in such rates, if any, shall be removed.
Rate adjustments hereunder shall be applied to Pipeline's rates in such a
manner that historical rate design concepts shall be maintained. In the
event a change in rates under the provisions of this Section 15.1 is
prevented by law from going into effect on a date specified herein, it
shall be made effective as soon thereafter as permitted by law.
(C) Procedure for Filing:
Pipeline shall file and place into effect, subject to suspension for not more
than one Day, changes in its jurisdictional rates to reflect any increase or
decrease in the cost to Pipeline for the use of electric power. Filings
hereunder shall be made effective on February 1 and August 1. Not less than
thirty (30) Days prior to the proposed effective date of a rate change pursuant
to this Section 15.1, Pipeline shall file with the Commission and shall mail to
each of its jurisdictional Customers, and interested state commissions revised
tariff sheets reflecting the proposed rate change together with a statement
showing the computation of the rate change. The filing effective February 1
each year shall include revised EPC Surcharges computed pursuant to Section
15.1(B)(4) above and revised Current Unit EPC Changes computed in accordance
with Section 15.1(B)(2); however, the filing effective