Texas Eastern Transmission, L P

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/14/2010, Docket: RP10-375-000, Status: Effective

Fourth Revised Sheet No. 617 Fourth Revised Sheet No. 617

Superseding: Third Revised Sheet No. 617

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

applicable Zone, rate schedule, and incremental service by the estimated

demand and commodity units to be billed weighted on the basis of the Base

Electric Power Cost Units for each applicable Zone, rate schedule, and

incremental service under all EPC Rate Schedules for the twelve Month

period beginning February 1. The EPC Surcharges for each applicable Zone,

rate schedule, and incremental service shall be rounded to the nearest

1/100 of a cent for commodity surcharges and 1/1000 of a dollar for demand

surcharges.

 

(5) Base Electric Power Cost Unit

 

The Base Electric Power Cost Unit for each applicable Zone, rate schedule,

and incremental service which are the unit Electric Power Costs included

in the Base Tariff Rates under Pipeline's EPC Rate Schedules shall be

reflected on the Statement of Rates for Effective Base Electric Power Cost

Units of this FERC Gas Tariff and the applicable Statement of Rates for

each incremental service.

 

(6) EPC Adjustment

 

The Current Unit EPC Change for each applicable Zone, rate schedule, and

incremental service computed in accordance with Section 15.1(B)(2) and the

EPC Surcharge computed in accordance with Section 15.1(B)(4) above shall

be added to the applicable demand and commodity components of Pipeline's

EPC Rate Schedules and the last previous units computed under the same

sections, which are contained in such rates, if any, shall be removed.

Rate adjustments hereunder shall be applied to Pipeline's rates in such a

manner that historical rate design concepts shall be maintained. In the

event a change in rates under the provisions of this Section 15.1 is

prevented by law from going into effect on a date specified herein, it

shall be made effective as soon thereafter as permitted by law.

 

(C) Procedure for Filing:

 

Pipeline shall file and place into effect, subject to suspension for not more

than one Day, changes in its jurisdictional rates to reflect any increase or

decrease in the cost to Pipeline for the use of electric power. Filings

hereunder shall be made effective on February 1 and August 1. Not less than

thirty (30) Days prior to the proposed effective date of a rate change pursuant

to this Section 15.1, Pipeline shall file with the Commission and shall mail to

each of its jurisdictional Customers, and interested state commissions revised

tariff sheets reflecting the proposed rate change together with a statement

showing the computation of the rate change. The filing effective February 1

each year shall include revised EPC Surcharges computed pursuant to Section

15.1(B)(4) above and revised Current Unit EPC Changes computed in accordance

with Section 15.1(B)(2); however, the filing effective