Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
Third Revised Sheet No. 616 Third Revised Sheet No. 616
Superseding: Second Revised Sheet No. 616
GENERAL TERMS AND CONDITIONS
(Continued)
(2) Current Unit EPC Change
The Current Unit EPC Change based on the Base Electric Power Cost Units
under Section 15.1(B)(5) hereof shall be computed as the difference
obtained by subtracting the Base Electric Power Cost Unit for each
applicable Zone, rate schedule, and incremental service from the quotient
obtained by dividing the estimated annual electric power costs as defined
in Section 15.1(B)(1) above for the applicable Zones, rate schedules, and
incremental services for the 12 Months beginning with the effective date
of the adjustment, allocated in accordance with the then currently
effective method in use for allocating Transmission Costs on Pipeline's
system, by the estimated demand and commodity units to be billed under the
applicable Zones, rate schedules, and incremental services under Section
15.1(B) for the same period. The Current Unit EPC Change for applicable
Zones, rate schedules, and incremental services will be rounded to the
nearest 1/100 of a cent for commodity rate adjustments and 1/1000 of a
dollar for demand adjustments. The Current Unit EPC change as determined
on the Base Electric Power Cost Units under Section 15.1(B)(5) hereof
shall be based on such change as determined with respect to the Base
Electric Power Cost Units under Section 15.1(B)(5) in such a manner that
historical rate design concepts shall be maintained.
(3) Deferred EPC Account
A Deferred EPC Account shall be maintained reflecting the under collection
or over collection of Electric Power Costs for each monthly billing
period. A separate sub-account shall be maintained, if necessary, for
each applicable incremental service. The Deferred EPC Account shall be
credited or debited as follows: Each Month all Electric Power Costs as
defined in Section 15.1(B)(1) above incurred by Pipeline shall be debited
to this account and all Electric Power Costs recovered by Pipeline shall
be credited to this account. Electric Power Cost recoveries will be
determined by multiplying the sum of the applicable Base Electric Power
Cost Unit plus the corresponding effective EPC Adjustment for each Zone
and rate schedule or applicable incremental service by the respective
monthly demand and commodity units to be billed. The Deferred EPC Account
shall be maintained in twelve-month accumulation periods, November-
October.
(4) Electric Power Cost (EPC) Surcharge Adjustments
The Electric Power Cost Surcharge Adjustments shall be computed for each
applicable Zone, rate schedule, and incremental service by dividing the
Deferred EPC Account Balance for such