9.6 The Base Segment Capacity Entitlements and the Operational Segment Capacity
Entitlements specified in the LINK® System and the contractual quantities specified in
executed service agreements are based on a winter peak day design assumption utilized
in designing and constructing Pipeline's facilities. The "ELA Total Operational
Segment Capacity Entitlements" are based on the assumption that at least 215,000 Dth of
Gas is being delivered into Pipeline's system on the Monroe lateral. To the extent
Pipeline in fact experiences a peak day under operating conditions other than those
assumed for a winter peak day design, Pipeline's ability to receive or deliver on the
same Day the aggregate MDQ for all Customers may be adversely impacted.
9.7 [Reserved for Future Use]
9.8 [Reserved for Future Use]