Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
First Revised Sheet No. 580 First Revised Sheet No. 580
Superseding: Original Sheet No. 580
GENERAL TERMS AND CONDITIONS
(Continued)
7.10 Flow Control
The Pipeline shall control flow of Gas into and out of its facilities at all
measurement facilities, but may allow the following if all of Pipeline's operating
standards and requirements are met: (a) Pipeline may allow third parties to control
flow into the Pipeline's facilities, and (b) Pipeline may allow third parties to
control flow out of the Pipeline's facilities, but reserves the right to override the
third party's flow control equipment.
7.11 Maintenance
(A) Major Maintenance
Major Maintenance shall include, but not be limited to, the repair or
replacement of major components and equipment required to support the
Measurement Operations. For measurement facilities which Customer or third
party owns and for which Pipeline performs Measurement Operations, such Customer
or third party shall be responsible for any and all associated costs of such
Major Maintenance unless otherwise agreed by Pipeline and Customer or third
party.
(B) Routine Maintenance
Routine Maintenance shall be the normal day to day maintenance required to
support the Measurement Operations or necessary to upkeep the measurement
facility and shall include, but not be limited to, replacement of minor
replacement parts for instrumentation, measurement equipment (including the RTU)
and minor valves and piping. The entity (Pipeline, Customer or third party)
which performs the Measurement Operations for the measurement facility shall
also be responsible for such Routine Maintenance and any and all associated
costs of such Routine Maintenance unless otherwise agreed by Pipeline and
Customer or third party.