Texas Eastern Transmission, L P

Seventh Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/02/2009, Docket: RP10-30-000, Status: Effective

Original Sheet No. 573C Original Sheet No. 573C

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

(iii) Pipeline determines in its sole discretion (a) that

the proposed pairing will physically occur on the

Pipeline's system within the same Monitoring Segment

as the Paired Receipts and in a way that wouild

alleviate any risk of a Liquefiable Hydrocarbon

Problem caused by the Paired Receipts and (b) that

the Paired Receipts will commingle sufficiently with

each other, assuming no other gas in Pipeline's

facilities, so that deliveries at the next downstream

delivery point will meet the Liquefiable Hydrocarbon

Limit; and

(iv) The Paired Receipts otherwise meet the specifications

in this Section 5.

 

(C) Pipeline shall determine whether the conditions in (B)

above are met as follows:

(i) Initial determination. After the deadline for timely

nominations for the Initial Gas Day, Pipeline shall

make a determination regarding whether the Receipt

Point operator's proposal satisfies the criteria in

subsection (B), and Pipeline will notify the Receipt

Point operator accordingly before the start of the

Initial Gas Day and shall post the Paired Points if

the proposal is approved. To the extent Pipeline

cannot determine that the pairing proposal meets all

of the above conditions in subsection (B), Pipeline

will provide a written denial specifying the basis

for its denial to the Receipt Point operator.

(ii) Daily determination. With respect to nominations for

any gas day after the Initial Gas Day, to the extent

Pipeline cannot determine that the pairing proposal

meets all of the above conditions in subsection (B),

Pipeline may suspend the pairing proposal for such

gas day.

(iii) Early submittal. Pipeline shall allow Receipt Point

operators to submit pairing proposals before a

Liquefiable Hydrocarbon Limit is issued, to be

effective in the event that such a Liquefiable

Hydrocarbon Limit is issued, but Pipeline will not be

obligated to evaluate such a proposal and reach a

decision regarding whether the proposal meets the

conditions in 5.10(B) before the deadline for timely

nominations for the Initial Gas Day.