event that Pipeline's acceptance of such gas under this Section
5.5(A) results in the diminution in quality, quantity or economic
value of gas transported for others, Customer who injects or
causes to be injected such gas into Pipeline's system shall be
liable for any damage caused thereby and such Customer shall
indemnify and hold Pipeline harmless from any damage caused
thereby; provided, however, that Customer shall not be obligated
to indemnify Pipeline for any damage resulting from Pipeline's
negligence or willful misconduct in its handling of the gas
pursuant to this Section 5.5(A).
(B) Notwithstanding the requirements set forth in this Section 5,
Pipeline may grant a waiver to allow Customer to tender or cause
to be tendered gas which does not, when injected into Pipeline's
facilities, meet the quality specifications set forth in Section
5; provided that acceptance of such gas shall not adversely affect
Pipeline's system facilities or operations, and further provided
that once such gas has been blended, to the extent blending
occurs, the commingled gas stream at any delivery point on
Pipeline's system shall be compliant with the quality
specifications set forth in Section 5. Pipeline shall post on the
LINK® System any waiver pursuant to this Section 5.5(B). Pipeline
shall implement this Section 5.5(B) on a non-discriminatory basis
and may cancel any such waiver at any time if necessary to assure
that the commingled gas stream is compliant with the quality
specifications set for the in Section 5 at any delivery point on
Pipeline's system.
(C) Gas Quality Phase-In of Existing Production
(i) The exemption contained herein only applies to receipt
meter facilities where receipts of natural gas began
flowing on or before May 1, 2009 into Pipeline's system
directly from production wells, a gathering system or a
processing facility, but such receipts do not meet (i) the
upper or lower Wobbe Number limits in GT&C Section
5.2(A),(ii) the upper Btu limit in GT&C Section 5.2(A),
(iii) the carbon dioxide limit in GT&C Section 5.3(C), or
(iv) the C2+ limit in GT&C Section 5.3(I), or any
combination thereof, and only to the extent that such gas
flowing on or before May 1, 2009 did meet the gas quality
specifications in Section 5 of the GT&C as they were in
effect at that time ("Exempt Receipts").