Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
Second Revised Sheet No. 567 Second Revised Sheet No. 567
Superseding: Sub First Revised Sheet No. 567
GENERAL TERMS AND CONDITIONS
(Continued)
physical injection capability based on such Customer's MDIQ. An OFO issued
pursuant to this Section 4.3(J) shall not affect those Customers whose Storage
Inventory is greater than or equal to 95% of MSQ at the time of issuance of the
OFO or those Customers whose remaining open inventory divided by the MDIQ is
equal to or less than the number of Days from the Day following issuance of the
OFO through the following November 15 minus 15 Days. For the duration of the
OFO under this Section 4.3(J), if the scheduled injection quantity is less than
the Mandatory Injection Quantity required for any Customer on any Day, an OFO
penalty charge pursuant to Section 4.3(A)(6)(b) of the General Terms and
Conditions will be imposed for all quantities less than 100% of the Mandatory
Injection Quantity. An OFO issued pursuant to this Section 4.3(J) shall be
canceled by Pipeline or when the aggregate Storage Inventory is equal to 95% of
MSQ. An OFO issued pursuant to this Section 4.3(J) shall be canceled by
Pipeline, on a Customer-by-Customer basis, when each Customer's Storage
Inventory is equal to 95% of MSQ.
(K) In the event total storage withdrawal capabilities decline to less than total
daily contracted storage withdrawal rights as revised due to in-field transfers
of inventory, Pipeline may issue an OFO pursuant to this Section 4.3(K) of the
General Terms and Conditions requiring that all quantities of Storage Inventory
transferred in place during the current winter period, November 15 to April 15,
be made available to the storage Customer having received the transfer at the
lesser of the storage withdrawal rights of the service receiving the transfer or
providing the transfer. Withdrawal rates, including ratchets, for the
Customer's non-transferred inventory will be calculated in accordance with the
storage withdrawal rights of that service. After the Customer has withdrawn his
non-transferred inventory, the transferred inventory will be made available at
the withdrawal rates, including ratchets, as calculated above. This OFO will be
canceled at such time that sufficient Quantities of Gas have been injected in
the aggregate by all storage Customers to increase physical withdrawal
capability to the sum of all Customers' contractual rights.