Texas Eastern Transmission, L P
Seventh Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/16/2009, Docket: RP10-53-000, Status: Effective
Second Revised Sheet No. 545 Second Revised Sheet No. 545
Superseding: First Revised Sheet No. 545
GENERAL TERMS AND CONDITIONS
(Continued
(4) Notwithstanding Sections 4.1(A)(1) and 4.1(A)(2), Customer shall have the
right to submit an Intra-day Nomination to revise the Point(s) of Receipt
and/or Point(s) of Delivery to any non-constrained pipeline segment for a
timely transportation nomination that had the original Point of Receipt
or Point of Delivery quantity denied due to over-nomination of that point
or non-confirmation of the quantity at that point. Such Intra-day
Nomination may be implemented by Pipeline subject to confirmation and if
such Intra-day Nomination is permitted, in Pipeline's reasonable
judgment, by Pipeline's system operating conditions.
If Customer submits an Intra-day Nomination on the same contract which
already has been scheduled to flow through a Posted Point of Restriction,
such Intra-day Nomination may be scheduled by Pipeline provided that the
Intra-day Nomination has a scheduling sequence priority that is being
scheduled and allowed to flow on the same Gas Day as the Intra-day
Nomination pursuant to Sections 4.1(I) and 30.6 of the General Terms and
Conditions and provided that the Intra-day Nomination does not result in
a net increase in the total volume scheduled on the contract through the
Posted Point of Restriction on that Gas Day.
(5) When a nomination for a date range is received, each Day within that
range is considered an original nomination. When a subsequent nomination
is received for one or more Days within that range, the previous
nomination is superseded by the subsequent nomination only to the extent
of the Days specified. The Days of the previous nomination outside the
range of the subsequent nomination are unaffected. Nominations have a
prospective effect only.